Savino Del Bene Milan Project Division has been selected by Siemens Transformers S.p.A., based in Trento, for the shipment of 9 transformers of 74 tons each and  3 transformers of  56 tons each,  destined to Alessandria, Egypt.
The goods were moved from Trento to Genova thanks to the support of Savino Del Bene Udine and loaded on a Messina vessel from the Genova terminal IMT.
The team of Milan Project Division managed the shipments of the 9 transformers, loaded in 19 containers of 18 x 40’ HC and 1 x 20’ box; the 3 transformers loaded in 10 containers of 10 x 40’ HC.
The success of this project is the result of a highly qualified staff and the cooperation between the Savino Del Bene offices.